Six Detention Terms to Settle Before You Haul
Free time, hourly rate, clock start, clock stop, cap and billing window. Ask for each in writing before you book. Same 5-hour wait pays $100 to $150.
Why this matters. Most detention fights start at the dock, but they are decided earlier, in the rate confirmation. Six small terms set the dollar amount, and most carriers read about two of them. Ask for all six in writing before you accept the load, and the same wait pays what you expected.
Example data and your contract
Every number below is invented. They show the method, not market rates. Whether a broker agrees to any term depends on the broker and your contract. If a term touches a legal right, check your contract and verify with a professional. We do not give legal, tax or financial advice.
The six terms
Detention is money for time spent waiting after free time runs out. These are the six terms that decide how much.
| Term | Ask this | Keep as proof |
|---|---|---|
| Free time | How many hours, at each stop? | Rate con line or email |
| Hourly rate | Flat per hour or prorated? | Rate con line |
| Clock start | Arrival or appointment time? | Gate log, check-in time, ELD stamp |
| Clock stop | Leaves the dock or leaves the gate? | Signed BOL with out time |
| Cap | Maximum hours or dollars per stop? | Email reply, saved to the load file |
| Billing window | How many days to submit? | Broker email or contract page |
From the guide on negotiating detention terms. A rate con line beats a phone promise.
Same wait, four term sets
Take one dock stay of 5 hours at $50 an hour. In the fourth set the truck arrived 30 minutes early and the clock starts at the appointment.
| Terms | What was agreed | Hours counted | Hours paid | Detention |
|---|---|---|---|---|
| A | 2 h free, $50 an hour, no cap | 5 | 3 | $150 |
| B | 3 h free, $50 an hour, no cap | 5 | 2 | $100 |
| C | 2 h free, $50 an hour, cap of 2 paid hours | 5 | 2 | $100 |
| D | 2 h free, $50 an hour, clock starts at appointment | 4.5 | 2.5 | $125 |
Invented dock stay and rate. Detention = (hours counted - free hours) x hourly rate. If a cap applies: the smaller of hours paid and the cap, x hourly rate.
A and B differ by one hour of free time, which is $50. C matches A until the cap bites. D shows why the clock start matters: 30 minutes of early arrival cost $25. None of this comes from the dock. It comes from words nobody asked about.
When the cap bites
A cap looks harmless on a short wait. It matters on a long one. Compare terms A and C on three invented waits.
| Wait, hours | Terms A, no cap | Terms C, cap of 2 h | Difference |
|---|---|---|---|
| 3 | $50 | $50 | $0 |
| 5 | $150 | $100 | $50 |
| 8 | $300 | $100 | $200 |
Computed with the formula above. Invented waits and rate.
At 3 hours the cap changes nothing. At 8 hours it takes $200 of $300. The cap sat in the fine print, so nobody had priced it. The longer the wait, the more a cap costs you, and long waits are the ones you most want paid.
Keep the proof where you can find it
A term is only as good as the record behind it. For each load, keep four things in the load folder: the rate con line or email with the terms, the gate log or check-in time, the ELD stamp for arrival, and the signed BOL with the out time. The detention evidence article shows how to collect them in 5 minutes. When the clock start and the clock stop are both on paper, an argument about whether you waited becomes arithmetic about how long.
How to ask
- Ask before you book, not after the wait. A term you ask for after the dock is a request. A term in the rate con is a line you can point to.
- Ask for all six. The rate is one term of six. Free time and the cap move the total more.
- Save the reply with the load. Keep it in the load folder next to the BOL.
- Write down when the clock stops. If time ends at the gate and not the dock, you lose the walk out.
- Check the billing window. A claim sent after the window may not be paid. Check your contract.
A short message works. Copy it and fill in the brackets:
Subject: Detention terms, load [number]. Hi [name], please confirm in writing: free time, hourly rate, clock start, cap per stop and the number of days to submit. Thanks, [your name], [company].
If the broker says no
Some brokers have fixed terms and will say so. Then you know what the load pays before you accept it, and you can price the load with that in mind. A longer free time lowers the detention you can bill, though it may come with a higher line haul. Compare the whole load on the load profit tool before you decide. If the rate con says nothing about detention, ask the broker and save the answer. Without a term, any claim later is a harder conversation. The rate con red flags guide lists other lines to read before you sign.
Common questions
- Can I ask on every load? You can ask. The answer tells you what the load pays.
- What if the rate con says nothing about detention? Ask the broker before you book and save the answer.
- Does a longer free time always cost me? It lowers the detention you can bill. It may come with a higher line haul, so compare the full load.
- Does a driver get paid for the same wait? That is a separate question. See driver detention pay against carrier detention billing in the guide on the difference.
Run your own free time and rate on the detention calculator before you say yes. The longer version of this article is the detention terms guide. To see what your last 20 loads show on waiting time and unpaid extras, request the free audit.
Related guides and tools
Guide
Detention terms to negotiate
The six detention terms worth settling in writing before the truck leaves the yard.
Guide
Detention pay
Record the right times at the dock, bill detention with the invoice and keep the proof a broker will ask for.
Tool
Detention
Billable detention hours and dollars from hours on site, free time, rate, increment and cap.
Guide
Rate con red flags
The clauses worth a second read before you accept a load, and what to ask about each.
Guide
Accessorial checklist by load type
A short list of extra charges to ask about for dry van, reefer, flatbed and drayage loads.